Very useful objective questions about ship
What does the word "draught" (draft) mean ?
The distance from the waterline to the keel.
Where is the monkey island ?
On top of the bridge.
What does the word "master" mean ?
The legal title of the captain.
What is the "after peak" ?
An enclosed space at the aft end of the ship.
What does the word "leeward" mean ?
Places where there is no wind blowing.
What does the term "in ballast" mean ?
A ship carrying water in place of any cargo.
What does the term "coil" mean ?
To stow a rope in a circular fashion.
What does the word "fathom" mean ?
A measurement equal to 6 feet (1.83 meters).
What does the word "overboard" mean ?
To discard items into the sea.
What does the term "weatherside" mean ?
The side of the ship from which the wind blows.
What does the word "gangway" mean ?
The means of access to the ship from the quayside.
What does the word "pallet" mean ?
A tray to carry cargo or on which cargo is fixed.
What does the term "sea time" mean ?
The difference between the ship's clock and Greenwich Mean Time.
What does the term "athwartships" mean ?
Across the ship from one side to the other.
What does the term "turn-to" mean ?
To start work.
What does the word "bitts" mean ?
Short cylindrical steel posts used to secure mooring lines.
What does the word "wake" mean ?
The disturbed water left astern of a ship.
What does the term "capsize" mean ?
To turn over.
The distance from the waterline to the keel.
Where is the monkey island ?
On top of the bridge.
What does the word "master" mean ?
The legal title of the captain.
What is the "after peak" ?
An enclosed space at the aft end of the ship.
What does the word "leeward" mean ?
Places where there is no wind blowing.
What does the term "in ballast" mean ?
A ship carrying water in place of any cargo.
What does the term "coil" mean ?
To stow a rope in a circular fashion.
What does the word "fathom" mean ?
A measurement equal to 6 feet (1.83 meters).
What does the word "overboard" mean ?
To discard items into the sea.
What does the term "weatherside" mean ?
The side of the ship from which the wind blows.
What does the word "gangway" mean ?
The means of access to the ship from the quayside.
What does the word "pallet" mean ?
A tray to carry cargo or on which cargo is fixed.
What does the term "sea time" mean ?
The difference between the ship's clock and Greenwich Mean Time.
What does the term "athwartships" mean ?
Across the ship from one side to the other.
What does the term "turn-to" mean ?
To start work.
What does the word "bitts" mean ?
Short cylindrical steel posts used to secure mooring lines.
What does the word "wake" mean ?
The disturbed water left astern of a ship.
What does the term "capsize" mean ?
To turn over.
Tuesday, February 14, 2017
Short Notes about Propeller
- 5 – 10% extra oil pressure to be applied, if not
- Isolate boss & apply dry ice to shaft, if not
- Heat the boss uniformly with low flame torch at not more them 200OC, if not
- Ask recommendation from manufacturer.
- Ensure Main engine is not turning (hang notice).
- Test report of seal assembly to be checked.
- Report of tail shaft polishing and magnetic crack detection
- Detail report if propeller repaired.
- Report of propeller polishing and crack detection (LPT)
- Visual inspection of threaded part of the shaft and boss.
- Cleanliness of shaft cone and re - roughen of the surface to be checked.
- When fixing to ensure that makers instruction to be followed.
- Radial reference mark on both propeller & shaft to coincide.
- Final push up pressure according to the temp of the boss, if boss TP↓ move oil pr.
- Loading ring should not come out more then 1/3 of the ring width.
- Distance travel by the boss.
Case Study: Hydraulic hose bursting
Introduction
On 10 May 1997, the
"JEANNIE," on a voyage from Boulogne, France, was bound for Montreal,
Quebec. The vessel, under the conduct of a pilot, was abeam of Lotbinière,
Quebec, when the bridge watch realized that the rudder angle indicator was hard-a-port.
They tried in vain to bring the vessel back on course by changing the steering
gear mode from the steering position on the bridge. At approximately 2255, the
"JEANNIE" grounded on the south edge of the channel in the approaches
to buoy Q83, before the anchor could be let go or the main engine put astern.[3]
After the grounding, the tanks were sounded
and it was found that only the forepeak was holed. The vessel's pumps were
unable to reduce the level of water in the tank below the waterline forward.
On May 11, at approximately 0700, two tugs
departed the Port of Québec to assist the bulk carrier. At approximately 1010,
as the tugs arrived on the scene, the vessel refloated herself on the rising
tide. At 1043, the vessel advised the Quebec Marine Communications and Traffic
Services that she had refloated and was anchored on the north side of the
channel.
The steering gear of the
"JEANNIE", manufactured by Donkin & Co. Ltd., is of the
articulated-cylinder type. The gear consists of two units, each including two
double-action cylinders. Each unit is fitted with a constant-speed pump. These
pumps are mounted on a single hydraulic fluid reservoir. A multiple-valve
collector isolates either of the units for maintenance or emergency manual
operation.
Accident Analysis
Breaking of a Hydraulic Hose
Visual inspection of the hydraulic hose
showed that it was hardened and cracked and that it had separated from the
coupling. The deterioration of the hose is attributable to the surrounding
sources of heat and wear. When a break occurs on a hydraulic component, the
single reservoir quickly empties its contents because of the constant-speed
pumps.
Alarms
When the amount of hydraulic fluid in the
reservoir drops to a predetermined level, an alarm sounds in the engine control
room. A crew member has to go into the steering gear compartment, identify the
problem, shut off four valves using a special wrench, and then open two other
valves to isolate the unit in trouble and thereby restore steering capability
to the vessel. When the first person arrived in the steering gear compartment,
the hydraulic fluid reservoir was already empty; thus, nothing could be done to
counter the failure.
The low-level alarm apparently sounded in
the engine control room. On the bridge, it was noticed that something was wrong
when the rudder-angle indicator read hard-a-port and the helmsman could not
return the helm amidships despite his efforts. The alarm was apparently not
heard by the personnel on the bridge.
Reservoirs
In spite of the direct access to the
steering gear compartment from the engine-room, the system was designed in such
a way that it would have drained completely even with the intervention of an
engineer. The two units are supplied by a single reservoir and there is no
storage tank permanently connected to the hydraulic system. Had each of the
units been fitted with an independent reservoir, the steering gear would have
remained in operation without intervention by the personnel. On some of the
more-recently built vessels, the steering gear remains in operation even when
one of the units fails.
Regulations
Canadian regulations require that in the
event of a failure, steering capability be maintained or speedily
restored. The requirements are more stringent, however, for tankers and
chemical tankers of over 10,000 gross tons. Such vessels have to be able to
restore steering capability less than 45 seconds after failure of a power
transmission system. In confined waters, all vessels should be able to regain
steering capability in the event of failure regardless of their size or type.
Several domestic and foreign tankers and chemical tankers of less than 10,000
gross tons that transit the St. Lawrence River and other confined waters
in Canada are not subject to these requirements.
The loss of hydraulic fluid from one of the
systems must be able to be detected and isolated automatically so that another
system or systems can remain operational.
The International Convention for Safety
of Life at Sea (SOLAS), Ch. II-1, Part C,
contains regulations for steering gear that are adopted by some classification
societies and are also found in the Canada Shipping Act. These
regulations apply to all convention vessels. Some of them read as follows:
Regulation 29, Art. 1:
. . . [t]he main steering gear and the auxiliary steering gear shall be so arranged that the failure of one of them will not render the other one inoperative.
. . . [t]he main steering gear and the auxiliary steering gear shall be so arranged that the failure of one of them will not render the other one inoperative.
Regulation 29, Art. 6.1.3:
. . . the main steering gear is so arranged that after a single failure in its piping system or in one of the power units the defect can be isolated so that steering capability can be maintained or speedily regained.
. . . the main steering gear is so arranged that after a single failure in its piping system or in one of the power units the defect can be isolated so that steering capability can be maintained or speedily regained.
Regulation 29, Art. 12.2:
. . . a low-level alarm for each hydraulic fluid reservoir to give the earliest practicable indication of hydraulic fluid leakage. Audible and visual alarms shall be given on the navigating bridge and in the machinery space where they can be readily observed; and
. . . a low-level alarm for each hydraulic fluid reservoir to give the earliest practicable indication of hydraulic fluid leakage. Audible and visual alarms shall be given on the navigating bridge and in the machinery space where they can be readily observed; and
Regulation 29, Art. 12.3:
. . . a fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir, where the main steering gear is required to be power-operated. The storage tank shall be permanently connected by piping in such a manner that the hydraulic systems can be readily recharged from a position within the steering gear compartment and shall be provided with a contents gauge.
. . . a fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir, where the main steering gear is required to be power-operated. The storage tank shall be permanently connected by piping in such a manner that the hydraulic systems can be readily recharged from a position within the steering gear compartment and shall be provided with a contents gauge.
2.5 Compatibility with International
Requirements
Where the main steering gear comprises two
identical power units, it should have the same capability and reliability as a
main power unit fitted with an auxiliary steering gear, and be capable of being
brought into operation from a position on the navigation bridge. In the event
of a power failure to either of the steering gear power units, an audible and
visual alarm must be given on the navigation bridge.
The steering gear of the
"JEANNIE" met regulatory requirements at the time of its
construction. This type of steering gear, in use on both foreign and Canadian
vessels, can be modified to prevent such a failure.
Conclusions
Findings
A steering gear hydraulic system hose
separated from its coupling, causing the hydraulic fluid reservoir to empty.
The crew could not intervene in time to
isolate the defective power unit.
A single reservoir supplied both steering
gear units, and there was no storage tank permanently connected to the
hydraulic system in such a manner that the system could be speedily brought
back into operation.
No audible or visual alarm indicating the
problem was noticed by the crew on the bridge.
Following the failure of her steering gear,
the "JEANNIE" grounded, causing damage to her forepeak.
This type of steering gear is in use on
both foreign and Canadian vessels.
Causes
The "JEANNIE" ran aground because
a steering gear hydraulic hose failed and the crew of the vessel could not
intervene and regain steering control before the two power units became
inoperative.
Wednesday, February 8, 2017
POWER CALCULATION (Power Card & Draw Card)
Q. What is power card?
ü
The power generated in the engine cylinder can
be evaluated by indicator diagram.
Q. What you will get from power card?
ü
We can get by power card:
¨ Mean Indicated Pressure
¨ Combustion and compression pressures
¨ Evaluation of the combustion process
¨ Evaluation of scavenging process
¨ Calculation of air temperatures in
the compression chamber.
Q.
How
you will calculate power
o
Determination of the indicated engine output… using
power card and PLAN formula
o
In order to determine
the indicated power, a set of diagrams are taken consisting of one diagram for
each cylinder. The area of the diagrams, and therewith the (MIP) Mean Indicated Pressure is determined by means of a planimeter.
o
MIP = Wnet (Area of the p-V diagram)
Stroke volume
Power (Watts) = Pm x L x A x n
Where Pm = Mean Indicated Pressure (N/m2)
L = Length of piston stroke (m)
A = Piston area (m2)
n = Power strokes / second ….
Note: (for 2 stroke engine n
power stroke/second
for 4 stroke engine n/2
power stroke/second)
Q. What are the things you consider when
calculating power?
o
The following to be considered:
ü
The prop is fully immersed.
ü
The ship is fully laden at an even keel.
ü
The ship is running neither with nor against a
head wind or heavy sea.
ü
The ship skin is not fouled by an underwater
growth.
Q.
What
are the safety measures you are taking?
o
Before taking a set of indicator diagrams the
following precautions should be taken. It is only then the diagram will record
truly the engine power.
a)
To reduce the effect of friction the indicator
piston is removed, the piston and the cylinder cleaned and lubricated with a
few drop of cylinder oil.
b)
The tightness of the indicator piston in the
cylinder should be checked. This can be done by dismantling the piston and
allowing it to drop slowly through the cylinder by its own weight. If the
bottom of the cylinder is closed the piston should be held at its position.
c)
The drum should not hit the stop at end
positions. Play in the pencil mechanism will distort the diagram.
d)
The cock should be free from accumulation of
soot and oil.
e)
The stylus should be adjusted to a light writing
pressure.
Q. How you will take power card without any error?
o
To take the indicator diagram —
— fasten the instrument to the cock so
that the cord is taut.
— Trace the atmospheric line with the
cock shut.
— Open indicator cock and lightly press
the stylus against the paper till the cycle is described.
— Close the cock.
Q. What is Draw Card?
ü
A draw diagram is in effect a pressure-time
diagram which is obtained by moving the drum at constant velocity during the
period covering a few degrees before and after the TDC.
Q. How you will take draw card without any
error?
ü
Indicator diagram 900 out of phase
ü
After taking the indicator diagram
— disconnect the c Open the indicator
cock and pull it by hand. A con1prcs and ignition sequence is recorded. The
pull is to be timed when the pencil is upward i.e. the piston is at the TDC.
Q. You have taken
draw card, you got compression pressure low, what are causes?
ü
Engine conditions which lower the compression
pressure are:
·
Piston ring and liner wear out,
·
Exhaust valve leak,
·
Defective lubrication,
·
Wearing out of bearings,
·
burning out of piston crown
·
Low scavenge pressure, fouling of exhaust
and/or scavenge air system, etc.,
Q. What is light
spring diagram? How you will take?
ü
The variation of pressure in the cylinder during
exhausting and scavenging is magnified in this diagram.
ü
This diagram is taken with a light spring.
Q. How you will asses the light
spring diagram?
1-
Exhaust valve open
2-
Scavenge port open
3-
Scavenge port closed
4-
Exhaust valve closed
Fig:
Light spring diagram
The
pressure during this part of the cycle being low, a light spring is utilised.
For most of the time the cylinder pressure is outside the range of the spring.
As the pressure drops part of the expansion curve is shown in the diagram. The
exhaust opens at 1 and there is an instantaneous drop in pressure (Blow down).
Exhaust gases rush towards the exhaust valve creating a pressure wave leaving a
low pressure region behind. The pressure drops till the scavenge ports are
opened at 2 and the scavenging takes place till scavenge ports close at 3.
The
drop in pressure (Blow down) is a measure of clearness of exhaust passages
(exhaust back pressure, Fouling of turbine and EGE).
This
diagram also shows the pressure of scavenge air inside cylinder when scavenge
port closes at 3. The scavenge port opening timing 2 and closing timing 3 is
same.
Choked scavenge ports
In power card this
defect will show as loss of power, low compression and ignition pressure and
high exhaust temperature. A light spring diagram will show a low pressure at
point 3 and 4 (closing of scavenge port and exhaust valve). The blow down will
be normal indicating normal exhaust back pressure.
High exhaust back
pressure
High exhaust back pressure manifests as loss of power in affected cylinder as well as high exhaust temperature and sooty exhaust. First power card is taken. If the compression pressure is normal and no defect is noticeable in fuel injection, a light spring diagram is taken. High pressure affects scavenging and fuel cannot burn properly.
Blow down is less compared to normal. This increase
in back pressure may be due to fouled turbine or EGE.
Q. How could you confirm indicator drive is
perfect?
Q. 4-stroke engine, power calculation (different
type).
Q. 4-stroke engine power/draw card analysis. What are
the limitations in case of 4-stroke engine?
Q. What is power balancing?
n Power produced in a diesel
engine is related to the quantity of fuel injected and time when injected,
n Balancing of power between
the cylinders is carried out by small adjustments to individual fuel
pumps on a running engine.
Q. How you balance power in two stroke & 4-stroke engine?
Q. What consideration you take when balancing power?