Those tanks which form a structural part of the ships hull and are
influenced in the same manner and by the same loads which stress the adjacent
hull structure. These are used for the carriage of LPG at or near atmospheric
conditions, butane for example, where no provision for thermal expansion and
contraction of the tank is necessary.
Wednesday, April 12, 2017
Wednesday, April 5, 2017
Liquefied Natural Gas (LNG)
LNG is natural gas from which most of the impurities such as sulphur and
carbon dioxide have been removed. It is cooled to or near its boiling point of
–165°C at or near atmospheric pressure and is transported in this form as predominantly
liquid methane. Methane has a critical temperature of –82.5°C, i.e. the
pressure and temperature above which liquification cannot occur, so that
methane can only be liquefied by pressure at very low temperatures.
Monday, April 3, 2017
Liquefied Gas Carriers
A large number of ships are in service which are designed to carry gasses in liquid form in bulk. Most of these ships are designed to carry liquefied petroleum gas (LPG), whilst a much smaller number of ships are designed to carry liquefied natural gas (LNG).
Friday, March 31, 2017
Fuel dribble (dripping) after injection
This occurs when the fuel supply is not precisely cutoff at the end of
fuel injection and fuel particles are accumulated on the tip of the
nozzle. If fuel dribble occurs after fuel injection, the fuel
in the cylinder will not burn completely. This will result in the
emission of black or white smoke being exhausted. To prevent fuel
dribble, the relief valve of the delivery valve is designed to draw back
any fuel that may drip out of the nozzle after injection. Fuel dribble
occurs if there is any failure in the delivery valve or injection
nozzle, as the residual pressure remains in the injection pipe after
fuel injection.
Chemical Tankers
The structural configuration and arrangements of chemical tankers often are
basically similar to those described for oil tankers. For some chemical
tankers, however, arrangements may also include a double bottom in way of cargo
tanks, a double skin construction or deck cofferdams or any combination of
these. Certain more hazardous cargoes may also require tanks which are separate
from the hull structure or are to be so installed that the tank structure is
not subject to major hull stresses. In the latter cases the scantlings and
arrangements may be similar to ships carrying liquefied gases.
Wednesday, March 29, 2017
Dry-Docking
Dry Dock Periods
A
docking survey should be carried out twice within a 5 year period. The
intermediate survey must be completed within 3 years. One of the two docking
surveys within the 5 year period should coincide with a special survey. A Docking
Survey is considered to coincide with the Special Survey when held within the
15 months prior to the due date of the Special Survey
An in water survey may be
accepted in lieu of the intermediate survey
For vessels operating in fresh
water special consideration may be given.
In-water Surveys
An
In-water Survey may be accepted in lieu of the intermediate docking between
Special Surveys, an *IWS notation is assigned. This requires suitable
underwater protection for the hull in part taking the form of high resistance
paint. This survey is to provide information normally obtained from a docking
survey.
The In-water Survey is to be carried out at agreed geographical locations under the surveillance of a Surveyor to LR, with the ship at a suitable draught in sheltered waters; the in-water visibility is to be good and the hull below the waterline is to be clean. The Surveyor is to be satisfied that the method of pictorial presentation is satisfactory. There is to be good two-way communication between the Surveyor and the appropriately qualified diver.
Should damage be found a dry dock may be required for better inspection
The In-water Survey is to be carried out at agreed geographical locations under the surveillance of a Surveyor to LR, with the ship at a suitable draught in sheltered waters; the in-water visibility is to be good and the hull below the waterline is to be clean. The Surveyor is to be satisfied that the method of pictorial presentation is satisfactory. There is to be good two-way communication between the Surveyor and the appropriately qualified diver.
Should damage be found a dry dock may be required for better inspection
Dry Dock file
Preparation
for dry dock begins after the ship sails from its previous one. A dry-dock list
of new items is created with specification sheets describing individual jobs.
These sheets are compiled into a dry dock file which some time before the due
date of the docking is submitted to several dry docks for pricing.
The jobs are priced individually and as a whole. This allows the ship managers to streamline the jobs to provide maximum value for money.
The jobs are priced individually and as a whole. This allows the ship managers to streamline the jobs to provide maximum value for money.
Preparation
The
vessel must be prepared before entering the dry dock. Structural loading must
be taken into account as the vessel is to be point supported on blocks. A
docking plan of the ships which shows such things as drain plugs, sea boxes,
underwater attachments etc is sent to the dry dock. Added to this are
indications where hull repairs are required. This allows the drydock ship
managers to place the blocks on which the vessel will sit.
The vessel must be trimmed so as to be equal draught with zero list. Special attention should be made when planning this for any tanks whose contents may be varied due to repair or housekeeping requirements.
The vessel must be trimmed so as to be equal draught with zero list. Special attention should be made when planning this for any tanks whose contents may be varied due to repair or housekeeping requirements.
In dock
The
safety and fire fighting responsibilities of the vessel are handed over to the
dry dock safety department for the duration of the dry and wet dock period. All
hot work, tank entry or jobs requiring special safety measures carried out by
ships crew must be first agreed with the dry dock safety department. A daily
meeting is held to discuss forth coming jobs and any special requirements. This
also allows the vessels staff and company representatives to monitor the
progress of the dock.
Inspections & Measurements
·
Where a ship is in dry-dock or on a slipway
it is to be placed on blocks of sufficient height, and proper staging is to be
erected as may be necessary, for the examination of the shell including bottom
and bow plating, keel, stern, sternframe and rudder. The rudder is to be lifted
for examination of the pintles if considered necessary by the Surveyor.
·
Attention is to be given to parts of the
structure particularly liable to excessive corrosion or to deterioration from
causes, such as chafing and lying on the ground, and to any undue unfairness of
the plating of the bottom.
·
The clearances in the rudder bearings are to
be measured.
·
The sea connections and overboard discharge
valves and their attachments to the hull are to be examined.
·
The propeller, sternbush and sea connection
fastenings and the gratings at the sea inlets are to be examined.
·
The clearance in the sternbush or the
efficiency of the oil glands is to be ascertained.
·
When chain cables are ranged, the anchors and
cables are to be examined by the Surveyor