Elaborate Description about PANTING & POUNDING



Pounding
When a ship meets heavy weather and commences heaving and pitching, the rise of the fore end of the ship occasionally synchronizes with the trough of a wave. The fore end then emerges from the water and re-enters with a tremendous slamming effect, known as pounding. While this does not occur with great regularity, it may nevertheless cause damage to the bottom of the ship forward. The shell plating must be stiffened to prevent buckling. Pounding also occurs aft in way of the cruiser stern but the effects are not nearly as great.
Panting           
As the waves pass along the ship they cause fluctuations in water pressure which tend to create an in-and-out movement the shell plating. The effect of this is found to be greatest at the ends of the ship, particularly at the fore end, where the shell is relatively flat. Such movements are termed panting and if unrestricted, could eventually lead to fatigue of the material and must therefore be prevented.
The structure at the ends of the ship is stiffened to prevent any undue movement of the shell.

Arrangement to resist Panting & Pounding:

Arrangement to resist panting:

The structure of the ship is strengthened to resist the effect of panting from 15% of the ships length from forward to the stem and aft of the after peak bulkhead.
In the forepeak:
o   Side stringers are fitted to the shell at intervals of 2M below the lowest deck.
o   Channel beams are fitted at alternate frames in line with the stringers and connected to the frames by brackets. Intermediate frames are bracketed to the stringer. The free edge of the bulkhead stringer may be stiffened by one of the beam.
o   The tank top is not carried into the peak, but solid floors are fitted in each frame. Floor are thicker & flanged on free edge.
o   The solid frames are 610mm a part and being so well supported.
o   The deck beams are supported by vertical angle pillars on alternate frames, which are connected to the panting beams (channel) and lapped onto the solid floors.
o    A partial wash plate is usually fitted to reduce the movement of the water in the tank.
o   Inter-coastal plates are fitted for two or three frame spaces in line with the centre girder.
o   Between the collision bulkhead and 15% length from the forward, the main frames together with their attachment to the margin, are increased in strength by 20%. In addition, the spacing of the frames from the collision bulkhead to 20% of the length from forward must be 700mm.
o   Shell plating thickness is increased by 5% to 15% depending upon ships length.
o   The collision bulkhead is stiffened by vertical bulb plates spaced about 600mm apart inside the peak.
o   The structure in the aft peak is similar in principal to that in the fore peak. The stringers and beams may be fitted 2.5m apart.


Arrangement to resist pounding:
The structure of the ship is strengthened to resist the effect of pounding (slamming forces) from collision bulkhead to 25% of the ships length from forward.
o   The flat bottom shell plating adjacent to the keel on each side of the ship is increased in thickness between 15% - 25% depending upon the length.
¥      The frame spacing in this region is 700 mm compare with 750mm – 900mm amidships.
¥      Longitudinal girders are fitted 2.2m apart, extending vertically from shell to the tank top.
¥      Intermediate half height girders are fitted to the shell reducing the unsupported width to 1.1M.
¥      Solid floors are fitted at every frame space and are attached to the bottom shell by continuous welding.
o   In longitudinally framed ship:
¥      The spacing of the longitudinal is reduced to 700mm and they are continued as far as forward as to the collision bulkhead.
¥      Transverse floor may be fitted at alternate frames.
¥      Full height side girders may be fitted 2.1m a part. 




Fore End Structure:




Wednesday, March 1, 2017

Responsibility of 2nd Engineer



Duty and responsibility of 2nd engineer is to plan, operate and carry out work in accordance with established rules and procedures to safe guard life at sea. Protect marine environment and maintain the seaworthiness of the vessel at all time.


1.      Maintain and update documentation

2.      Engine room management

3.      Engine room house keeping

4.      Safety of engine room and ship

5.      Carry out Saturday routine

6.      Machinery maintenance

7.      Pollution prevention
8.      Emergency procedure

1.Maintain and update documentation :
Documentation under 2nd engineer responsibility which requires maintaining and updating are as follows :


1.      Daily record book

2.      Machinery maintenance record book

3.      Defect and repair list

4.      Major spares inventory

5.      Oil record book

6.      FFA and LSA record book

7.      Saturday routine book

8.      Engine room look book

9.      Updating of  PMS

10.  Stores and ROB
11.  Lub oil and chemical inventory

2.Engine room management :


1.      Personally responsible to C/E

2.      Ensure engine room is properly manned

3.      Proper distribution of jobs

4.      Clear briefing done before a job is carried out

5.      Ensure all engineer and crew practice safe working procedure and wears safety gears at all time

6.      Guidance and proper training of juniors

7.      Ensure everyone understands the consequence of pollution
8.      Observation of shore all personnel’s

3.Engine room house keeping :


1.      Ensure E/R is maintained in clean, painted & sanitary condition

2.      Ensure all tools & stores are kept safely & designated location

3.      Secure all heavy items at all times

4.      All leaks & damages are attended ASAP

5.      Bilge, garbage and sewage management as per regulation
 


4.Safety of E/R and ship :


1.      Ensure all engineers know the location of LSA & FFA

2.      All emergency escape routes are clearly marked and obstruction free

3.      Maintenance of all FFA & LSA under 2/E responsibility
 
5.Carry out Saturday routine :


1.      Testing of emergency fire pump

2.      Emergency generator and emergency air bottle

3.      Life boat engine

4.      Flap and ventilation

5.      CO2 bottle (links, secured & key location)

6.      Testing of fire detectors

7.      Testing of E/R fire detectors, extinguishers

8.      Check the funnel flap

9.      Remote operated fire doors

10.  Hydrants & nozzles in engine room

11.  BA set life lines & fireman’s outfit in E/R

12.  All E/R ship side v/v operation
13.  Testing of engine room lifting gears

6.Machinery maintenance :

1.      In state of readiness at all time

2.      Proper round check at all time

3.      Safe operation of all machinery on board

4.      PMS jobs to be carried out

5.      Attend to all major repair work

6.      Keep track of all defects and repair required

7.      Able to manage any other emergency repairs outside PMS
8.      Ensure handing/ taking over reports cover the engineer’s general duties, their performance and any special job as a requirement

7.Pollution prevention :


Ensure all engineers to know :

1.      Operation of oily water separator

2.      Operation of incinerator

3.      Operation of  sewage plant

4.      Oil transferring procedure

5.      Oil record book & E/R look book updating
Ensure all bilge overboard valves are shut and locked in port and in special area.

8.Emergency procedure :


1.      Steering gear emergency procedure

2.      M/E local control

3.      Fire & abandon ship

4.      Flooding/ Grounding/ Collision

5.      Power failure procedure

6.      Oil spill drill

Wednesday, February 22, 2017

Reason for motor running hot



Mechanical problem

1.      Bearing wear down

2.      P/P impeller jam

3.      P/P gland too tight

4.      Any blockage

5.      Shaft installignment-(after o’haul)

6.      Fan not working

7.      Cooling fan dirty – too much painting

 
 
Electrical problem

1.      Single phasing

2.      High voltage – speed-high/load-high/overheat

3.      Low voltage – current increase to maintain require torque

4.      Low frequency –flux-high/current-high/fan speed-low

5.      High frequency – speed-high/load-high

6.      Repeated start/stop

7.      Prolong starting

8.      Delta connected motot start on star & run on star